Conveyor Belt System Jinping II
Jinping, Yalong River (CN)
Client
Ertan Hydropower Development Company Ltd.
Execution of the Works
Marti Technik AG, Moosseedorf
Construction Period
2007 – 2009
Contract Sum
USD 54 million
More…
Less…
Object
Hydroelectric power station with an output capacity of 4800 MW.
Project planning and execution of the complete conveyor belt system, including the electrical installation and the visualised control system
Services provided
- Tunnel belt installation 14,700 m
- External conveyor system 2 × 7000 m
- Conveyor belt tunnel 2000 m
- Disposal conveyor system 8 × 270 m
- Control and electrical installation
- Total discharge flow 11 million tons
- Tunnel conveyor system capability 1800 t/h
- External conveyor system capability 2 × 2800 t/h
- Disposal conveyor system capability 2 × 2800 t/h
- Driving power of the tunnel conveyor system 2800 kW
- Driving power of the external conveyor system 5900 kW
- Driving power of the disposal conveyor system 8 × 850 kW
General Conditions
- difficult topographical conditions
- high conveyor capability
- Reinforced concrete production location in field- factory
Contact
Marti Headquarters LatAm
Nueva de Lyon 145
Providencia, Santiago de Chile
Tel. +562 2957 4253
Fax +562 2957 4304
info-latam@marti.com