Propiedad
Canton Jura Engineering Department
Autor del proyecto y dirección de obra
Ingenieurgemeinschaft
GGT SA + Gähler & Partner AG
Plazo de ejecución
2007 – 2010
Valor contractual
USD 160 million
Realización
Groupement Tunnel de Bure
Socios del consorcio
Marti Tunnelbau AG, CH-3302 Moosseedorf
Parietti & Gindrat SA, CH-2900 Porrentruy
Marti Travaux Spéciaux SA, CH-2087 Cornaux
Gerencia - dirección técnica y comercial
Marti Tunnelbau AG, CH-3302 Moosseedorf
más…
menos…
Descripción
Tunnel de Bure, national highway A16
- Double track tunnel between Boncourt-Porrentruy
- Lot 2.602
- Length of the tunnel: L = 3' 091 m
- Ventilation buildings on top of three ventilating shafts
- 3 double emergency stopping bays
- Ventilation buildings in the cut and cover section at the north and south portals
Prestaciones
- Excavation with TBM-drive Ø = 12.60 m, A = 125 m², with concrete segmental lining
- Brive length: L = 2' 902 m
- Production of the precast units in our own factory in Klus-Balsthal
- Systematic exploratory drilling ahead the face to identify Karst caverns
- Excavation of the 2 ventilation shafts and one access shaft by drill and blast H = 25 m, Ø = 5 m
- interior work: technical gallery under the roadway, waterproofing membrane, concrete lining, suspended ceiling, roadwork and pavements, ventilation buildings, cut and cover sections at the portals